Home | → Projects | Health & Safety | Skip Hire | Contact Us |

 

At Premier Access Scaffolds we treat every job with the expertise needed to complete works to the highest standards. We pride ourselves on developing a close working relationship with our clients, this can span from small or emergency access solutions to larger, long term projects. Always keeping in mind service & coasts we enable our clients to plan their work with the confidence that with a simple phone call or meeting, any access needs will be taken care of.

Please see examples of our clients and works below.

• Hawkins Insulation Ltd
• J & S Seddon Ltd
• David Wilson

Project: Sovereign Shopping Centre, Weston Super Mare.

Erected within a shopping centre, this scaffold enabled redecorating works in a very public area. Hoarding and protection were required to safeguard the public. This scaffold also required beamwork to span the width of the corridor within the shopping centre and to retain a public walkway beneath.
Project: Brentry Housing Estate, Bristol.

This Site shows our scaffold on a typical new build housing estate, with blocks of flats as well as smaller blocks of houses. On this particular site we were contracted by Countryside Properties.
We also currently supply scaffold for David Wilson Homes at sites in Glastonbury and Warlmey. New build sites require a great deal of co-ordination and liaison with site managers to ensure that scaffolds are completed on time and to specification.

Project: Buchanans Warf, Bristol.

Works on this building included paint and roofing repairs. As you can see from the photographs, the waterside elevation required us to erect the scaffold in a strong load-bearing manner as we could not support the scaffold from the ground due to the river below. Again a high profile job, as this large building is situated in central Bristol and in an area where the public are often present. This particular project shows a more complicated external scaffold with consideration to the public using Heras fencing and warning tape on the waterside elevation using shoring scaffold and aluminum beams, you can also see that hop-ups and hoists were required to complete the access requirements.

Project: Geol Ferry Bridge, Bedminster, Bristol.

An Interesting site for us as this job required the scaffold to be hung from beneath the bridge as well as enclosing the bridge for painting works. This site was contracted to us by Ian Williams Ltd.

Project: Bristol & West Tower, Bristol

On this project we provided scaffold for demolition and refurbishment works.

 


Unit 6, Avonside Industrial Park
Avonside Road
St Philips Marsh
Bristol
BS2 0UQ
Tel: 08456 77 66 88
Fax: 01179 71 96 35
Email: info@premieraccessscaffolds.co.uk
Company Reg. No. 5007498